MetroVolt and Data Centers, Honestly

MetroVolt is the burner in a data-center housing — a design study with four open gates, described without softening.

What MetroVolt is

MetroVolt is not a separate machine. It is the burner (a D-3He tandem-mirror generator) packaged for a specific customer: data centers. The same physics defines it as defines the Aegis housing — a 26.49 T plug, a 17 T throat, direct energy conversion, and a neutron fraction of 5.44%. The name reflects intended use, not a distinct technology.

Because MetroVolt is the burner, it inherits the burner's four honest gates. We restate them here rather than bury them, because a data-center operator evaluating this concept deserves the unvarnished picture.

The four gates, applied to MetroVolt

Two of these bear directly on the data-center use case. The fuel gate means commercial-scale operation depends on a He-3 supply that would have to come from breeder breeding or lunar sources (see helium-3 supply and strategy). The availability gate means MetroVolt is not, today, a sole reliability source for a Tier III facility.

Why we publish this

It would be easy to present MetroVolt as a finished data-center solution. We do not, because the gates are real and because a customer misled about reliability or fuel would discover the truth in operation, not the brochure. Honesty here is also self-interest: trust earned by candor outlasts a sale won by overclaiming.

See Aegis and defense installations, honestly and data centers and firm power.

Content reviewed August 2026 · design-and-simulation stage