Skip to content
Technology How it works Breeder — Hyperion Burner — Aegis Burner — MetroVolt AI-Native Architecture Magnets Fuel cycle Safety Roadmap
Solutions AI & Data Centers Defense & Government Grid & Baseload Neutron Detection Quantum
Learn Technical Library
Proof Publications Whitepapers Technical Library Open Science & Reproducibility The Honest Gates
Company About / Mission Leadership Environment Health & Safety Investors Careers Press Contact
3D Model
MetroVolt › Readiness & Timeline
Readiness & Timeline

Developing Aegis and MetroVolt Together

Aegis and MetroVolt are one burner core in two housings; developing them together means the ~2032 test unit advances both products at once.

One core, two housings

Kronos’s burner is a single machine — a D-³He tandem-mirror generator with a 26.49 T plug, 17 T throat, neutron fraction near 5.44%, and direct energy conversion — offered in two housings. Aegis serves fixed defense installations; MetroVolt serves data centers and cities. The physics under development is identical.

This is efficient for readiness. Every gate the burner core must clear — confinement, high field, DEC, materials — is shared. The ~2032 test unit proves the core once, informing both products. Only the housings, interfaces, and siting differ.

Co-located siting — generator beside the loadMetroVoltburnerData-center campusAI compute loadCity grid tieFirm power delivered on-site — short interconnect, small footprint, minimal water.

Where the housings diverge

Because the housings do not change the physics, MetroVolt’s readiness tracks the burner core’s readiness. A test-unit result that validates the core validates it for both Aegis and MetroVolt; a shortfall affects both. The products diverge only after the core is proven.

Content reviewed August 2026 · design-and-simulation stage