Skip to content
Technology How it works Breeder — Hyperion Burner — Aegis Burner — MetroVolt AI-Native Architecture Magnets Fuel cycle Safety Roadmap
Solutions AI & Data Centers Defense & Government Grid & Baseload Neutron Detection Quantum
Learn Technical Library
Proof Publications Whitepapers Technical Library Open Science & Reproducibility The Honest Gates
Company About / Mission Leadership Environment Health & Safety Investors Careers Press Contact
3D Model
Hyperion › What It Makes
What It Makes

Products and the Honest Gates

Every product figure Hyperion quotes is contingent on open questions: net TBR at the 1.8 target, tritium self-sufficiency, and center-post lifetime.

What has to be true for the figures to hold

Local TBRcell-level, ideal— realistic penalties —ports & gapsstructure & coolantlosses & holdupNet TBRas-builtmust stay ≥ 1.0 with margin

Hyperion's product figures — the ~4 kg/yr tritium class, the ~1.97 kg/yr helium-3 coproduct, and the neutron-service capacity — are design-and-simulation targets, not demonstrated yields. Candor requires naming the gates each one depends on. These are physics-and-engineering findings, stated plainly to build trust, and none of them is an economic statement.

The open questions

How the gates resolve

Closure comes from full-geometry neutronics, blanket and extraction engineering, and ultimately from measured tritium and helium-3 production at first-of-a-kind first tritium near 2030, with NOAK and BOAK refining the record. No net-gain claim is made before FOAK.

Why we publish the gates

Overstated breeding claims are the most common failure point in fusion fuel-cycle proposals. By stating TBR as a lever, separating local from net, and naming self-sufficiency and center-post lifetime as open, Kronos keeps the product story defensible. The figures are honest targets; the gates are the conditions under which they become facts.

This page describes a design-and-simulation study, not a built machine. Construction begins Q2 2027; first-of-a-kind (FOAK) first tritium is targeted near 2030. No net-gain claim is made before FOAK.

Content reviewed August 2026 · design-and-simulation stage