KRONOS·FUSION
Learn › Simulation register
Simulation register · S64

S64 — Economics tornado

See it live in the 3D Model →

S64: Economics tornado. Tier-1 · reduced-order, part of the Kronos MetroVolt 81-analysis validation record (DOI 10.5281/zenodo.21746479).

Register ID
S64
Campaign
Paper 4 — DEC, Plant & Economics
Status
Tier-1 · reduced-order
Deposit
DOI 10.5281/zenodo.21746479

S64 derives the plant economics — the LCOE ladder and required power-purchase price on the published, gate-adjudicated basis.

This is a register summary of a deposited analysis; its title and notes quote the deposit as-run, so parameters here may reflect the pre-Mode-D basis where they differ — all operating claims cite the frozen Mode-D point (ratified 24 July 2026). Full input decks, scripts, and output data for every analysis S01–S81 are released openly under CC BY 4.0 at DOI 10.5281/zenodo.21746479.