Technical LibraryOperations & Commissioning
Operations & Commissioning

Performance Demonstration

Sustained operation at the design point, measured against the frozen targets.

Operations & CommissioningUpdated 2026-08-11
Goal
Meet frozen targets, measured

The final commissioning stage sustains operation at the design point and measures it against the frozen targets — the breeder's Q = 3.076 and 85.0 MW, the burner's QE = 1.31 under its stated gate conditions. It is where computed design targets meet measured reality.

Kronos frames these targets as the demonstration goal, not a present claim.

Common questions

What is performance demonstration?

Showing the machine reaches its design targets — gain, confinement, steady operation — with measurements, turning modelled figures into demonstrated ones through the ascension campaign.

How does this relate to the gates?

It is how the later go/no-go gates are satisfied: performance is demonstrated against explicit criteria rather than claimed.

← PreviousOperating the Fuel CycleNext →Power Ascension
Content reviewed August 2026 · design-and-simulation stage