Technical LibraryOperations & Commissioning
Operations & Commissioning

The First-Plasma Campaign

The initial low-power discharges that prove integrated operation.

Operations & CommissioningUpdated 2026-08-11
Milestone
Reproducible first plasma

Once systems are proven cold, the first-plasma campaign achieves breakdown and low-power discharges, demonstrating that magnets, control, vacuum and fuelling work together. It is a headline milestone but only the start of physics operation.

Reproducible plasma initiation is the exit criterion.

Common questions

What is the first-plasma campaign?

The initial period of plasma operation after commissioning, establishing reliable breakdown, current ramp and basic control — the start of physics operation, not the finished machine.

Does first plasma mean the machine works?

It is a major milestone but only the beginning; the power-ascension campaign that follows is what demonstrates real performance.

← PreviousRunning the Plasma
Content reviewed August 2026 · design-and-simulation stage