Glossary
The Deployment Roadmap
The staged path from design study to fielded products.
The roadmap runs design study → component demonstration → integrated prototype → commercial products, gated at each step. Construction of the HYPERION breeder is scheduled to begin in Q2 2027; the later stages Kronos presents as targets with named gates rather than firm dates.
The roadmap runs design study, then component demonstration, an integrated prototype, and commercial products (AEGIS and MetroVolt), gated at each step. Construction of the HYPERION breeder is scheduled to begin in Q2 2027; the later stages Kronos presents as targets with named gates rather than firm dates or guarantees.