KRONOS·FUSION
Learn › Simulation register
Simulation register · S08

S08 — Monte-Carlo UQ

See it live in the 3D Model →

S08: Monte-Carlo UQ. Tier-2 · deck-deposited (HPC-pending), part of the Kronos MetroVolt 81-analysis validation record (DOI 10.5281/zenodo.21746479).

Register ID
S08
Campaign
Paper 1 — Overview & Integrated Design Basis
Status
Tier-2 · deck-deposited (HPC-pending)
Deposit
DOI 10.5281/zenodo.21746479

S08 closes one of the coupled physics-to-engineering constraints that make the MetroVolt design point self-consistent.

This is a register summary of a deposited analysis; its title and notes quote the deposit as-run, so parameters here may reflect the pre-Mode-D basis where they differ — all operating claims cite the frozen Mode-D point (ratified 24 July 2026). Full input decks, scripts, and output data for every analysis S01–S81 are released openly under CC BY 4.0 at DOI 10.5281/zenodo.21746479.